Welcome to Guangdong Meide Testing Technology Co., Ltd.!

Testing Lab of Lighting Products

Guangdong Meide Testing Technology Co., Ltd.

Guangdong Meide Testing Technology Co., Ltd.Location:Home > News

Return

Complete IES LM-79-19 Testing Guide for LED Luminaires

1. What is IES LM-79 Test?

IES LM-79 (full title: IESNA LM-79-19) is a solid-state lighting photometric & electrical measurement standard issued by the Illuminating Engineering Society (IES) of North America, updated to the latest 2019 edition. It is the core mandatory testing specification for LED luminaires accessing North American market and applying for DLC, ENERGY STAR and UL certifications.

For LED high bay lights, LM-79 testing objectively quantifies critical performance metrics including luminous flux, efficacy, intensity distribution, CCT and CRI. It serves as authoritative performance proof for downstream buyers and a fundamental prerequisite for North American commercial channel access.

Core Standard: IESNA LM-79-19 (valid current version: 2019) Scope: Complete solid-state lighting fixtures (high bay, street light, flood light, panel light, etc.) Test Ambient Condition: Ambient temperature: 25°C ±1°C; Relative Humidity ≤65%

2. Core Test Parameters of LM-79

表格

Parameter Definition Unit
Luminous Flux Total visible light output emitted in all directions by luminaire lm (lumen)
Luminous Efficacy Luminous flux generated per unit input power lm/W
Luminous Intensity Distribution Spatial luminous intensity data for IES file generation cd (candela)
CCT (Correlated Color Temperature) Color appearance of light source (warm / neutral / cool white) K (Kelvin)
CRI / Ra Color rendering capability with full score 100 Dimensionless (0~100)
Input Power Actual active power consumption of finished lamp W (Watt)
Power Factor Ratio of real power to apparent power Dimensionless (0~1)

3. Comparison of Two Mainstream LM-79 Test Methods

表格

Test Method Integrating Sphere Goniophotometer
Applicable Luminaire Size Max. 1/5 diameter of integrating sphere Large-size fixtures: high bay, street light
Main Test Content Total luminous flux only Full-space intensity distribution + total flux
Output Document Flux test report Standard .ies photometric file
DLC / ENERGY STAR Preference Only acceptable for small lamps Preferred for complete luminaire certification

4. Detailed LM-79 Test Procedure

Step1 Sample preparation & pre-aging: Prepare 2~3 representative samples and age for minimum 100 hours. Step2 Test environment setup: Stabilize ambient temperature at 25°C±1°C, block stray ambient light; preheat testing equipment over 30min. Step3 Electrical parameter measurement: Record input voltage, current, power and power factor. Step4 Photometry test: Full-spatial scanning via goniophotometer to calculate total flux and luminous efficacy. Step5 Colorimetric test: Measure chromaticity coordinate, CCT, CRI and R9 via spectroradiometer. Step6 Standard IES file generation: Export photometry data into industry-standard .ies format per IESNA specification. Step7 Report issuance & audit: Formal LM-79 test report released by NVLAP-accredited laboratory.

5. Linkage between LM-79 Test & Global Certifications

表格

Certification Program LM-79 Mandatory Lab Qualification Requirement Remarks
DLC QPL Listing Required NVLAP accredited lab LM-80 report required together
ENERGY STAR Required NVLAP accredited lab ISTMT thermal test report additionally needed
UL 1598 Safety Certification Supplementary UL recognized lab Focused on product safety compliance
IEC CB Certification Supplementary IECEE CB Scheme lab Corresponding standard: IEC 62722-2-1

6. Key Compliance Notes

  1. For DLC application, LM-79 reports must be issued by NVLAP-certified labs and dated within prior 36 months before submission.
  2. Actual tested luminous flux ≥90% of marked nominal value; actual input power ≤110% of rated power; measured CCT shall fall within ANSI chromaticity tolerance ellipse.
  3. Generated standard .ies file can be directly imported into professional lighting simulation software: DIALux, AGi32, Relux etc.

7. FAQ

Q: Relationship between LM-79 test and UL certification? A: LM-79 covers photometric & electrical performance testing while UL focuses on product safety assessment; they complement each other. Valid NVLAP LM-79 report is compulsory for DLC listing application.

Q: How long does LM-79 testing take? A: Standard lead time: 2~4 weeks including mandatory 100-hour pre-aging and over 30min equipment preheating under controlled 25°C±1°C environment.

Q: Required sample quantity? A: Minimum 2~3 test specimens; final report is calculated based on average test data of all submitted samples.

Q: Validity period of LM-79 test report? A: No statutory expiry date for the report itself, yet DLC & ENERGY STAR mandate reports issued within latest 3 years. Retest is required once product design or component is revised.

Disclaimer This document is AI-assisted for reference only and shall not be deemed certification commitment or legal advice. All implementation shall follow the latest official IES and regulatory standards.

WhatsApp

WhatsApp

E-mail

E-mail

WeChat

WeChat

二维码Scan WeChat
TOP